Home Railways 509 CR For Rail Flyovers

509 CR For Rail Flyovers

Bhubaneswar: To enhance train operational capabilities and reduce congestion, the Ministry of Railways has sanctioned Rs 509 crore for the construction of two major railway flyovers in Cuttack and Rayagada districts, officials said today.

The Centre has sanctioned 10.89 km long rail flyover between Rajathgarh-Radhakishorepur & Machhapur in Cuttack District and 05.50 km long rail flyover at Singapur Road Station in Rayagada District.

This initiative is part of the broader Energy, Mineral & Cement Corridor Scheme of Indian Railways, aimed at improving train movements and alleviating traffic congestion across key railway lines, the officials said.

The Cuttack flyover project will enhance operational capabilities by facilitating simultaneous train movements without the delays caused by cross-traffic. The flyover will be constructed with a total cost of Rs 268.92 crore.

Similarly, the 5.50 km rail flyover will be constructed at Singapur Road Station in Rayagada district, addressing traffic congestion on the Raipur-Vizianagaram Rail Line. This development will allow for uninterrupted train movements in and out of the station, avoiding delays caused by cross-traffic. The estimated cost of this project is Rs 239.83 crore.

The new flyovers will allow for the simultaneous movement of trains from multiple directions, improving the efficiency of train operations across the region.

The flyovers will address existing operational challenges by eliminating cross-traffic, which currently leads to significant delays and inefficiencies at key junctions like Singapur Road Station, Rajathgarh, Radhakishorepur, and Machhapur.

The projects will ease congestion in the Nergundi-Cuttack-Barang-Rajathgarh area and the Rayagada-Singapur Road corridor, ensuring smoother train operations and faster travel times.

With reduced delays and enhanced operational flow, the new rail flyovers will improve the overall travel experience for passengers traveling through these regions.

Currently, major junctions in the Khurda Road and Waltair divisions experience traffic bottlenecks due to cross-movements at Singapur Road and Rajathgarh-Radhakishorepur-Machhapur stations.

These constraints cause significant delays, as up and down trains often have to wait for cross-traffic clearance. The new flyovers will remove these obstacles by creating dedicated paths for trains from various directions, ensuring uninterrupted movements.